Work Packages
WP100: Management
Objective: Manage and coordinate project activities.
WP200: Technology and requirements
Objective: Perform technology survey and state-of-the-art review, and define the requirements of the system and Concept of Operations (ConOps).
WP300: Guidance, Navigation, and Control
Objective: Enable decision-making processes for the swarm and sensor input evaluation. The objective is achieved by the development of algorithms, frameworks, and simulations.
WP400: Command, Control, and Intelligence
Objective: Assessment of the interoperability, data links, and communications of the system.
WP500: Unmanned Traffic Management and Airspace Integration
Objective: Study the integration of drones conducting beyond line of sight (BVLOS) flights into the national airspace system incorporating military airspace. The objective is achieved by the development of risk-assessment and Concept of Operations (ConOps), and by performing flight tests.
WP600: Demonstration
Objective: Demonstrate the key features of the developed system in a simulation environment and in a flight demonstration.